Because a date field is stored and displayed in different formats within SAP the following code is required to convert the date into a format which can be input onto a screen field.
* Date field data: ld_date(8). ld_date(2) = sy-datum+6(2). ld_date+2(2) = sy-datum+4(2). ld_date+4(4) = sy-datum(4).